Building Agreement In India

by on Dec.04, 2020, under Uncategorized

Before signing a construction contract between the owner and the contractor, it is necessary to ensure that all property is properly covered, so that there is sufficient legal protection. There should be no conflict in the payment method. The method of payment can be made in cash, cheques or electronic transfers in accordance with the reciprocal agreement. The law of the land should be respected so that there are no problems. You can cancel the payment at the end of the month. If you are unable to pay large bills at a time, you can negotiate with the contractor to have the bill paid in increments. The frequency of payments and the volume of payments need to be clarified. The owner. for the purpose of building a multi-storey building on the land, may tender for one or more contractors. In its offer, the bidder generally describe the proposed work, plans, drawings, specifications and other documents, if necessary. The bidder will also provide an estimate of the quantity and cost of materials, labour and other costs, and payment terms. On the balancing of the offer and after consultation with the owner`s architect, an agreement is reached with the contractor.

The owner can show his architect the plans, drawings, specifications and other documents for the construction. Normally, the construction agreement between the owner and the contractor contains details of the work to be carried out and the rights and obligations of the owner and contractor and – part that the architect will play when the work is completed. The construction agreement provides, among other things, that the contractor provide the necessary equipment for work, equipment, water, equipment and machinery. The contractor performs the work in accordance with the plans, drawings, specifications and documents agreed by the parties. Both parts will be guided at each step by the architect`s instructions. The construction, the type of construction, the defective construction, the renovation work for the defective buildings are decided and directed by the architect. The progress of the work and the conditions of payment to the contractor are expressly provided. The deadline for completion, execution and compensation for delays and escalating costs should be set.

Responsibility for obtaining the necessary sanction and certificates for construction, water and electricity connections should fall to the contractor who must obtain the certificates of completion from the municipality concerned. The owner is responsible for the additions or modifications of the agreed plan at the same level as for the work performed under the contract. The owner should be exempt from liability to third parties for an accident that occurred during the contractor`s execution of the work, and the sole liability would rest with the holder who takes all precautions. All materials brought to the site and used in construction must be paid for and unused materials must be removed immediately after completion of the work. The owner is not liable to an employee or supplier of goods or services or to the payment of invoices or obligations relating to this construction. Until the completion of the construction and completion certificate, the holder is not entitled to pay the final invoices.


Comments are closed.

Looking for something?

Use the form below to search the site:

Still not finding what you're looking for? Drop a comment on a post or contact us so we can take care of it!

Blogroll

A few highly recommended websites...